Operations

Four districts, one schedule.

Ameristar runs its rig schedule out of a single operations centre in Midland so that iron, crews and logistics move as one system rather than four regional fiefdoms.

Where we work

Operating districts

Permian Basin — Midland & Delaware

8 rigs · HQ district

Our home district and the bulk of the fleet. Multi-well pad development, laterals to 20,000 ft, heavy pad-walking utilisation and 24-hour rig-move crews. Company yard and machine shop.

Eagle Ford — South Texas

3 rigs · Since June 2026

Condensate and gas window development with tight surface constraints and significant landowner interface. South Texas district yard.

Bakken — Williston Basin

2 rigs · Winterised

Fully winterised rig packages, enclosed floors and heated mud systems for continuous operation to −40°F. Williston Basin district yard.

Gulf of Mexico — Shelf & Deepwater

5 rigs · Marine & aviation base

Three jackups on the shelf and two semi-submersibles in deepwater, supported by the marine and aviation divisions. Dedicated Gulf shore base.

Operations centre

One room, eighteen rigs.

Every Ameristar rig streams real-time drilling data to our Midland operations centre over WITSML. Drilling engineers, directional specialists and the fleet maintenance desk sit in the same room, watching the same screens, on a two-hour handover cadence.

That means the pressure trend that looks odd at 0300 gets a second set of eyes before it becomes a well control event, and the top drive that starts drawing extra current gets a part on a truck before it fails.

  • 24/7/365 staffed, two-hour formal handover
  • WITSML real-time feed shared with the operator
  • Predictive maintenance alerts on all major rotating equipment
  • Remote directional and geosteering support
  • Integrated marine and flight following for offshore assets
Control cabin

Performance

Operating metrics since start-up

MetricPermianEagle FordBakkenGulf of Mexico
Rigs operating8325
Wells delivered30853
Rig uptime97.1%96.8%95.2%96.0%
Avg. spud-to-rig-release (days)14.216.518.941.6
Avg. pad move (hours)263134
Recordable incidents0000

Figures are internal operating statistics for the period from incorporation (14 March 2026) to 2 September 2026 and are unaudited.

How we take work.

Ameristar does not tender publicly and does not accept unsolicited enquiries. Programmes come to us through operators we already work for.